Electrifying a regional aquatic centre without upgrading the power supply, and winning the grant to pay for it
Concept design and a successful $2.5M Community Energy Upgrades Fund application to electrify a regional NSW indoor aquatic centre: heat pumps for pool water and hall, VSDs and controls, solar and battery, 229 tCO2e a year avoided with no supply upgrade.
North Sydney Building: electrifying a heritage office building in the only plant space it has
An end-of-life chiller and gas boiler in a heritage North Sydney council building replaced with two 200 kW 4-pipe heat pumps, staged across the seasons so the building never lost heating or cooling.

